Building Project
PROJECT FINISHED IN 2015

Localisation
Three prestigious chalets will be set up on the heights of Crest-Voland, a charming and discrete Village, part of the Espace Diamant. Located only 200 meters far away from the ski slopes, their remarkable location allows easy access to the ski runs and enjoys a splendid view on the Aravis massif. The association of high standards including a welcoming capacity of 12 persons and an energy performance aiming ensures secure value for your future property. See the plan




Project Description
I/Groundwork
Strip foundation in reinforced concrete following the design office instructions.
.
II/ Structural Work
Ground floor made of 13 cm reinforced concrete slab – Shear and peripheral wall of 16 cm reinforced concrete. First floor solid slab made of 20 cm of reinforced concrete.
.
III/ Carpentry – Roofing
The post and beam construction system is used for the first and second floor – The roof structure is made of large purlins (30 cm x 30 cm) and rafters – Vapour barrier layer – Heat Insulation – Watertightness Layer – Wooden Shingles called « Tavaillons » – Overall Sarking system.
.
IV/ High performance thermal insulation
Ground slab sandwiched between 2 layers of 50 millimeters of foams panels of polyurethane – Buried wall insulation made of 100 millimeters of foams panels of polyurethane (styrodur) – External insulation of the concrete wall made of 160 millimeters of expanded polystyrene – Insulation of the 1st and 2nd floor wall made of 200 millimeters of stone wool – Roof insulation made of 260 millimeters of compacted stone wool – Garage wall insulation made of 145 millimeters of stone wool – Garage roof insulation made of 80 millimeters of polyurethane foam.
.
V/ Millwork and double glass
External doors and windows made of 68 millimeters red pine – Anti break double pane insulated glass with argon gas to improve energy efficiency– Interior door made of larch – Outside balcony, floor and window shutters made of larch – Built-in washbasin in the bathroom.
.
VI/ Electrical installation
In accordance with the norms.
.
VII/ Plumbing and sanitary
Enameled cast iron bathtub – Wall mounted toilet – First Class bathroom mixers – Rain recovery system to for the needs of toilets and garden – Multilayered pipe for the water supply network – PVC wastewater evacuation.
.
VIII/ Heating, Hot Water Heating, Controlled Mechanical Ventilation System
Underfloor electrical heating system – Hot Water Electric heater (2 x 300 liters) – Double Flow Controlled Mechanical Ventilation System (DATEC) coupled with a thermodynamic system (heat pumps) – The air intake is connected to a ground-coupled heat exchanger. The system also redistributes the heat of the chimney.
.
IX/ Kitchen
Kitchen area with ceramic glass cooktop – Large Fridge – Traditional oven and microwave – Dishwasher Two-compartments sink – Granit Worktop
.
X/ Flooring
Oaked Parquet Floor “Smoky Mountain” by Solidfloor.
.
XI/ Inside Walls Coverings
Plaster coating – Faïence 20 x 20 – Rustier Paintwork – Several colors available on request – Impregnation agent for wood.
.
XII/ Outside Paintwork
Light white textured coat on heat insulation. No Paintwork on the wood (no maintenance).
.
XIII/ Garage Equipment
Ski shoe dryer – Automatic overhead door dressed with larch wood.
.
XIV/ Energy Label Scheme
Energy Consumption reaching the C level — Greenhouse Gas Emissions reaching the B level.
.
XV/ Insurance policies for Structural Damage and CNR
Note : Our company reserves the right to change technical aspects in order to improve the quality of the whole operation.
.